The source of this material must be acknowledged when publishing or issuing it to others. Banqueting House, Whitehall Benchmark scaffolding completed a large duo pitch span roof over the prestigious Banqueting House in Whitehall for Gardiner & Theobald. This material may be used, reproduced, stored or transmitted for non-commercial purposes. If there is any inconsistency or conflict between any of this material and the legislation, the legislation shall prevail. If in doubt with respect to any information contained within this material, or for confirmation of legal requirements, please refer to the official Statutes and Regulations of Alberta. The Crown, its agents, employees or contractors will not be liable to you for any damages, direct or indirect, arising out of your use of this material. The official Statutes and Regulations should be consulted for all purposes of interpreting and applying the law. All persons making use of consolidated legislation are reminded that it has no legislative sanction, that amendments have been embodied for convenience of reference only. The material provided is solely for the user’s information and convenience.
ROOF SCAFFOLD BRACKETS CODE
This material is sourced from the Alberta King’s Printer consolidation of the Occupational Health and Safety Act, Occupational Health and Safety Regulation and Occupational Health and Safety Code and, while thought to be accurate, is provided without warranty of any kind. Suspended platform is braced to prevent swaying. Platforms are completely planked between the hangers, and On blocks that are secured to the side of the hangers below each beam as an To the vertical hangers at least 300 millimetres above the bottom of the

Suspended platform is supported by lumber beams that are 38 millimetres by 140 The first thing to understand when installing roof brackets is to use these only on one-story roofs with a low pitch. To a block that rests on the top edge of each thrustout as an additional Find used Roof Brackets Scaffolding for sale on eBay, Craigslist, Letgo, OfferUp, Amazon and others. Maximum distance between thrustouts is 2.3 metres,Ī working platform is suspended or thrust out, the platform isīy vertical lumber hangers that are 38 millimetres by 140 millimetres or largerĪnd not more than 3 metres long secured to the side of each thrustout andĮxtending at least 300 millimetres above the top of each thrustout, and The Hop up Bracket for Tube and Fitting Scaffolding, sometimes known as a stage bracket or platform bracket is available in both 2 board & 3 board width and. Than 1.5 times the length of the outboard portion, Inboard portion from the fulcrum point to the point of anchorage is not less Inboard ends of thrustouts are securely anchored against horizontal or vertical Failure to do so could result in serious injury or death.Ī,, bigrocksupply.Are constructed of lumber that is 89 millimetres by 140 millimetres and placedĭo not extend more than 2 metres beyond the edge of the bearing surface,Īre securely braced at the fulcrum point against movement or upset, Galvanised or aluminium tube guardrails are acceptable as long as they meet the relevant current. Warning: Users must strictly adhere to the manufacturer’s inspection, installation, maintenance and use directions and must follow local, state and federal safety regulations. CB unit includes two (2) brackets and one (1) brace. wide scaffold frames can be erected around chimney construction.or chimney repairs. Work platform is fully planked and guardrails are installed. Mason Style Scaffolding Frames Light Duty Scaffolding Frames Scaffolding Wall Brackets Interior Scaffold. Serves as starter platform to level off sloped roof so 5-ft. Line up bolt on staging bracket (in vertical position) with sheathing and stud, attach handle to bolt and tighten until bracket is firmly in place. Drill 5/8" hole 2" from stud into the sheathing and into 2"x 4" plank long enough to span the interior studs. Must be installed directly onto walls sheathed with 3/4" thick exterior grade plywood. Walls must be adequately braced to support the system.

Phase of Constructionįloor joist installation, roof truss installation, window installation, roof sheathing, shingling

Minimum of 2 units needed for the system. Guardrail available when installed over 6 feet above ground toe board also required. Providing a complete range of roof brackets, Qualcraft. Bracket that bolts through walls to support 36" platform (2" thick planks) with 2 workers and an additional 75 pounds per 8' section. Qualcraft 2504 Fixed Roof Bracket, Adjustable, Steel, Red, Powder-Coated, For: 12/12 Fixed Pitch Roofs.